Development Code Full document |
(709Kb)
|
|
The Development Code includes engineering guides, requirements and standards for subdivisions and development within the Papakura District. The documents include:
|
Part One: General Requirements and Procedures |
(213Kb)
|
Part Two: Earthworks and Foundations |
(157Kb)
|
Part Three: Roads |
(366Kb)
|
Part Four: Stormwater Drainage |
(336Kb)
|
Part Five and Six: Water Reticulation System and Waste Water |
(139Kb)
|
Part Seven: Parks and Reserves |
(259Kb)
|
Part Eight: Power, Telephone and Gas |
(144Kb)
|
|
|
Appendices Full Document (excluding Appendix G)
|
(407Kb)
|
|
The Appendices includes the following:
|
A: Statement of Professional Opinion |
(57Kb)
|
B: Certificate of Construction |
(51Kb)
|
C: Soakage Pit Design |
(158Kb)
|
D: Assets to Vest Sheets |
(372Kb)
|
E: Electronic As-Built Requirements |
(426Kb)
|
F: Road Asset Date Standard Specification |
(316Kb)
|
H: Standards and Guidelines Relevant to the Road Network |
(105Kb)
|
Appendix G: Standard Detail Drawings List
|
(210Kb)
|
General Standard Detail Drawings |
(478Kb)
|
Roading Standard Detail Drawings
(Note this is a large file)
|
(3.43Mb)
|
Stormwater Standard Detail Drawings Part One: SW1 - 10
(Note this is a large file)
|
(7.1Mb)
|
Stormwater Standard Detail Drawings Part Two: SW11 - 22
(Note this is a large file)
|
(3.2Mb)
|
Parks and Reserves Standard Detail Drawings |
(828Kb)
|
UWI manage the water and wastewater infrastructure on behalf of Council.
Click here to download the relevant sections of the Development Code.
All enquiries and approvals should be directed to United Water
|
|
Engineering plan approvals
|
For information on Engineering plan approvals and an Application Form for Engineering Plan Approval for Public Infrastructure Work, please refer to the following documents.
|
Information on Engineering Plan Approvals |
(29Kb)
|
Application Form for Engineering Plan Approval |
(36Kb)
|